Boston Permit Planning
Boston's Historic District Commissions and the Pre-Permit Review Requirement
Boston maintains nine local historic district commissions, from the 1955 Historic Beacon Hill District to the 2022 Highland Park Architectural Conservation District. Any exterior alteration to a structure within a district boundary requires design review and approval by the relevant commission before Inspectional Services can issue a building permit. Interior work, kitchen remodels, bath updates, flooring, and interior painting, moves through the standard ISD process, but the exterior envelope of a property inside any of Boston's nine districts carries an additional approval step. Scoping exterior work without accounting for commission timelines is how project schedules slip. We identify which commission governs your address during the estimate walkthrough so nothing is scheduled out of order.
More Than Half of Boston's Housing Units Predate World War II
With 54 percent of Boston housing built before 1939, pre-war triple-deckers, masonry rowhouses, and older wood-frame structures are the norm on almost every project we take on here. Original kitchens, outdated electrical and plumbing systems, settling foundations, and masonry that requires specialized repair rather than standard new-construction methods are conditions we document before a written estimate is issued. Boston's 30 to 50 freeze-thaw cycles each winter compound the wear on exterior assemblies. A crew that has not worked in that era of construction will underestimate existing conditions. We account for them during every walkthrough.
Painting & Wallpaper
Tile & Carpet
Cabinet Refacing
Accessory Structures ≤ 200 Sq. Ft.
Fences Up to 7 Ft.
Cosmetic Interior Finish Work
Included in Project Planning
We manage the permit process on your behalf through Boston's Inspectional Services Department. If your project involves exterior work within one of Boston's nine designated historic districts, we identify that during the estimate walkthrough so the full commission approval sequence is clear before any work is scheduled. Boston's ISD requires a permit for virtually all non-cosmetic residential work, and we handle the filing and coordinate the sequence so nothing moves ahead of required approvals. Boston inspectors issued 398 violations for unpermitted work in a recent reported year, up more than 10 percent from the prior period. Documented authorization protects you at resale and removes exposure to code-enforcement action after the job closes.